Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR06-00441
StatusFinaled
Name AMERICAN FIRE PROTECTION LLC
Site Address 2323 S FEDERAL WAY
Project NameSPR DYKMAN ELECTRICAL
Customer Number 
ePlanReview 
Description
DYKMAN ELECTRICAL INC * To install an extended wet, gridded, overhead OH-1 and light hazard occupancy protection into an existing 12,436-ft/2 office / warehouse building. An adjoining 12,250-ft/2 warehouse is fully sprinklered. This remodel will convert approximately 1,746-ft/2 of the existing warehouse area into office in conjunction with remodel of existing 2,800-ft/2 office. Fire sprinkler work is related to selective demolition, the construction of new structural elements, two restrooms, an accessible locker / shower room, exercise, breakroom, conference, display, reception / waiting and office areas. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit BLD06-00384. Revised 8/22/2006: This plan review is the result of changes made in the field during construction which affected the remote area @ col. # 10, 9, A - C. The calculation summary provided is approved and does not appear to adversely affect the operation of the system as it was originally designed.
The original approved plan was to install an extended wet, gridded, overhead OH-1 and light hazard occupancy protection into an existing 12,436-ft/2 office / warehouse building. An adjoining 12,250-ft/2 warehouse is fully sprinklered. This remodel will convert approximately 1,746-ft/2 of the existing warehouse area into office in conjunction with remodel of existing 2,800-ft/2 office. Fire sprinkler work is related to selective demolition, the construction of new structural elements, two restrooms, an accessible locker / shower room, exercise, break room, conference, display, reception / waiting and office areas. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD06-00384.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/15/200611/17/200611/17/2006PPASS
DetailsForrest France
Final fire sprinkler inspection passed.
INSP-Final Inspection11/13/200611/15/200611/16/2006PDEFR
DetailsForrest France
Inspection rescheduled for 11/17
INSP-Sprinkler Rough-in/Hydro10/17/200610/17/200610/17/2006PPART
DetailsForrest France
OH hydrostatic test passed inspection.
INSP-Sprinkler Rough-in/Hydro10/13/200610/16/200610/16/2006AFAIL
DetailsForrest France
AG hydrostatic test failed due to visible leakage and guage pressure loss.
INSP-Sprinkler Rough-in/Hydro10/12/200610/13/200610/15/2006PNR
DetailsForrest France
Scheduled by a contractor via Hello! on 10/12/2006 at 1:54:43 PM. Contact: ###-####.
INSP-Sprinkler Rough-in/Hydro10/12/200610/13/200610/12/2006ACANC
DetailsForrest France
Scheduled by a contractor via Hello! on 10/12/2006 at 1:49:39 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Oct 12 2006 1:57PM.
INSP-Sprinkler Rough-in8/17/20068/18/20068/18/2006PPART
DetailsForrest France
Partial inspection for the hard lid areas in the remodeled portion of the project are okay to cover as initialed on the approved plans.