Permit Number | FIR06-00488 |
Status | Finaled |
Name |
TREASURE VALLEY FIRE PROTECTION
|
Site Address |
287 N MAPLE GROVE RD
|
Project Name | SPR SMOKE GUARD |
Customer Number | |
ePlanReview | |
Description |
SMOKE GUARD - To add 9 SSP's on the Manufacturing First Floor, 2 SSU's in Area "A", 6 SSP's in Area "B" and 2 SSU's in Area "C", on the Second Floor for the remodel of an existing 31,645-ft/2 manufacturing building for a new tenant (formerly occupied by "PRECO"). Fire sprinkler work is related to the construction of interior partitions on the first floor to create two new office spaces. The construction of partitions on the second floor to modify work areas, and construction of new accessible shower unit. This building is fully fire sprinklered. This plan, permit and fire "Inspection Card" are required to be on site as a condition of this permit, to provide witness of compliance verification of meeting minimum code. This permit is attached to BLD06-01095 permit.
|