INSP-Final Inspection | 12/19/2006 | 12/19/2006 | 12/19/2006 | P | PASS |
Forrest France
|
|
|
Required corrections verified for completion, fire sprinkler permit finaled.
|
INSP-Final Inspection | 12/15/2006 | 12/18/2006 | 12/19/2006 | A | PART |
Forrest France
|
|
|
Need to provide pressure relief valve for the grid system, provide "911" sign at the bell.
|
INSP-Final Inspection | 12/14/2006 | 12/15/2006 | 12/15/2006 | P | CANC |
Forrest France
|
|
|
Jonathan is the contact @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice
|
INSP-Sprinkler Rough-in/Hydro | 12/4/2006 | 12/5/2006 | 12/5/2006 | A | PART |
Forrest France
|
|
|
AG hydrostatic test completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 12/1/2006 | 12/4/2006 | 12/4/2006 | P | FAIL |
Forrest France
|
|
|
Start pressure below min. 200 psi. upon arrival for test. Notified contractor, inspection to be concluded on 12/5.
|
INSP-Sprinkler Rough-in | 11/7/2006 | 11/9/2006 | 11/9/2006 | A | PART |
Forrest France
|
|
|
OH rough-in is approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 11/7/2006 | 11/9/2006 | 11/8/2006 | A | NR |
Forrest France
|
|
|
To be rescheduled.
|
INSP-Sprinkler Rough-in | 9/25/2006 | 9/26/2006 | 9/26/2006 | A | PART |
Forrest France
|
|
|
OH sprinkler rough-in is good for cover at the hard lid ceiling areas only.
|