Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR06-00496
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 465 W GOWEN RD
Project NameSPR BOISE SCHOOL DISTRICT TRAN
Customer Number 
ePlanReview 
Description
BOISE SCHOOL DISTRICT TRANSPORTATION CENTER - To install a complete overhead wet system in a 17,213-ft/2 one story Type II-B building with a 1,613-ft/2 mezzanine. This building has been designed for non separated uses with fire sprinklers used for area. Uses shall include assembly room, classrooms, offices and repair shop. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. The underground fire service supply was installed under FIR06-00444. This permit is attached to building permit, BLD06-00275.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/19/200612/19/200612/19/2006PPASS
DetailsForrest France
Required corrections verified for completion, fire sprinkler permit finaled.
INSP-Final Inspection12/15/200612/18/200612/19/2006APART
DetailsForrest France
Need to provide pressure relief valve for the grid system, provide "911" sign at the bell.
INSP-Final Inspection12/14/200612/15/200612/15/2006PCANC
DetailsForrest France
Jonathan is the contact @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice
INSP-Sprinkler Rough-in/Hydro12/4/200612/5/200612/5/2006APART
DetailsForrest France
AG hydrostatic test completed satisfactory.
INSP-Sprinkler Rough-in/Hydro12/1/200612/4/200612/4/2006PFAIL
DetailsForrest France
Start pressure below min. 200 psi. upon arrival for test. Notified contractor, inspection to be concluded on 12/5.
INSP-Sprinkler Rough-in11/7/200611/9/200611/9/2006APART
DetailsForrest France
OH rough-in is approved for cover.
INSP-Sprinkler Rough-in/Hydro11/7/200611/9/200611/8/2006ANR
DetailsForrest France
To be rescheduled.
INSP-Sprinkler Rough-in9/25/20069/26/20069/26/2006APART
DetailsForrest France
OH sprinkler rough-in is good for cover at the hard lid ceiling areas only.