Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR06-00500
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 3800 S ORCHARD ST
Project NameSPR MICRON HANGER
Customer Number 
ePlanReview 
Description
MICRON HANGER - To install approximately 50'-0" of 8" C-900 PVC underground and 8" Class 50 D.I. riser through the floor, located in the Southeast corner of a new 15,000-ft/2 one story, Type II-B aircraft hanger with office space. The building will be fire sprinklered for area increase. Hanger area is 12,427-dt/2 and the office area is 2,573-ft/2. The fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD05-02719.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/7/20073/7/20073/7/2007PPASS
DetailsTroy Cobbley
permit finaled
INSP-Supply line flush11/27/200611/27/200611/27/2006PPASS
DetailsTroy Cobbley
Underground flush passed
INSP-Sprinkler Rough-in/Hydro11/14/200611/15/200611/15/2006APASS
DetailsTroy Cobbley
Underground hydro test passed. The end of the test was witnessed by Mike Clay the general contractors representative.
INSP-Sprinkler Rough-in10/4/200610/5/200610/6/2006PPASS
DetailsTroy Cobbley
Underground ok to cover. To get the correct bury depth the finish grade will need to be within 1" of the bottom of the siding on the building and level with the pavement at the adjoining parking lot.