Permit Number | FIR06-00583 |
Status | Finaled |
Name |
TREASURE VALLEY FIRE PROTECTION
|
Site Address |
190 E BANNOCK ST
|
Project Name | ST LUKES |
Customer Number | |
ePlanReview | |
Description |
Install new sprinkler heads to new wall and ceiling layouts. Contractor to utilize existing 1" outlets and/or mechanical tee's. The building scope of work is the remodel of an existing 2,559 sq. ft. area for relocation of the Phlebotomy Lab per red-line notes on plans and all attached plan review conditions of all reviewing agencies as part of the approved plans. Work includes selective interior demolition; construction of non-combustible, fire-resistive walls to create blood draw areas, work, reception, Autology, temporary waiting,staff lounge/locker rooms and accessible route to all remodeled areas; construct two fully accessible restrooms and enlarge main waiting area; and upgrade electrical, plumbing, mechanical, fire suppression & alarm systems per tenant needs and minimum code compliance; modify suspended ceiling grid system, millwork & finishes. drs
|