Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR06-00620
StatusFinaled
Name MICRON TECHNOLOGY INC FA
Site Address 8000 S FEDERAL WAY
Project Name 
Customer NumberC9453
ePlanReview 
Description
Fire Alarm System: C9453 B01/07 The existing Pyrotronics fire alarm control panel will be replaced with a new Edwards control panel. All associated initiating devices will also be replaced with Edwards devices. The existing Pyrotronics System 3 horn panel will remain, along with the notification appliances. Notification coverage for both buidings will be brought up to code in the process.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/25/200811/26/200811/26/2008APASS
DetailsForrest France
Fire alarm permit finaled.
INSP-Final Inspection11/24/200811/25/200811/25/2008ADEFR
DetailsForrest France
Please call 30 min prior to arrival. Phone #: ###-#### Internet Inspection Request from: Jeff Walton
INSP-Final Inspection10/31/200811/4/200811/5/2008APART
DetailsForrest France
Reinspection for noted corrections regarding cleanroom area fire alarm notification (see activity notes 4/29) completed acceptable.
INSP-Alarm Testing10/8/200810/14/200810/14/2008APART
DetailsForrest France
UF heat detectors at the cleanroom areas tested acceptable, SD for door release at the north side okayed, two manual pulls and one heat detector at the service isle passed.
INSP-Alarm Testing10/3/200810/7/200810/7/2008APART
DetailsForrest France
Inspection completed for cleanroom area ceiling mounted heat detectors only, need to provide accurate addressing at plenum #5, install one missing junction box cover. Intelligent detectors not tested at this time.
INSP-Alarm Testing10/2/200810/2/200810/2/2008PPART
DetailsForrest France
Tested remainder of SD at the 2nd floor ceilings including the mechanical and corridor areas, manual pull stations and (AC) smoke detectors at the west corridor tested okay, one added SD approved, duct detectors at the gas bunker passed. See plans for annotations.
INSP-Alarm Testing9/26/20089/30/200810/1/2008APART
DetailsForrest France
Tested remainder of smoke and heat detectors at the above ceiling areas noted on 1st floor drawings, see plans for locations of spot detectors at the 2nd floor ceiling tested today marked in green, noted overspaced area at the NE corner, inspection completed on 9/30 (PM).
INSP-Alarm Testing6/25/20086/26/20086/26/2008ACANC
DetailsForrest France
Overbooked
INSP-Alarm Testing6/16/20086/18/20086/18/2008APART
DetailsForrest France
See locations marked on plan set for heat and smoke detection devices (AC's) tested today at the second floor mechanical level.
INSP-Alarm Testing5/27/20085/30/20085/30/2008ACANC
DetailsForrest France
Please call 30 min. prior to arrival Phone #: ###-#### Internet Inspection Request from: Jeff Walton Overbooked
INSP-Alarm Testing5/12/20085/14/20085/14/2008APART
DetailsForrest France
Testing for the second floor AHU duct detectors completed okay as noted on plans with the exception of address changes at three locations and sample tubes to be extended as necessary for red-lined locations.
INSP-Alarm Testing4/23/20084/29/20084/29/2008APART
DetailsForrest France
Horn and strobe testing completed for the cleanroom areas only, noted locations on plan in need of revision.
INSP-Alarm Testing4/23/20084/28/20084/28/2008APART
DetailsForrest France
Completed preliminary walkthrough of cleanroom areas prior to fire alarm notification test to verify positioning, cd settings and spacing of horn/strobe appliances.
INSP-Alarm Testing3/31/20084/2/20084/1/2008ACANC
DetailsForrest France
Will call in inspection for next week when.KR
INSP-Alarm Testing1/30/20082/1/20081/30/2008ACANC
DetailsForrest France
Please call 30 min prior to arrival. Phone #: ###-#### Internet Inspection Request from: Jeff Walton Inspection cancelled from web by: Jeff Walton
INSP-Alarm Testing1/28/20081/29/20081/29/2008APART
DetailsForrest France
Tested horn strobe notification devices for the second floor mechanical and electrical room areas including the penthouse mech. except as noted per annotations (circut 52 and the 2nd floor corridor, noted one area lacking sufficient coverage, need weatherproof back box for the h/s at the roof deck, noted cd ratings on the as-built plans are not accurate to the field install at some locations, audibility is satisfactory.
INSP-Alarm Testing1/17/20081/24/20081/24/2008ACANC
DetailsForrest France
Please call 30 min prior to arrival Phone #: ###-#### Internet Inspection Request from: Jeff Walton
INSP-Alarm Testing1/17/20081/23/20081/23/2008ACANC
DetailsForrest France
Please call 30 min prior to arrival Phone #: ###-#### Internet Inspection Request from: Jeff Walton Inspection cancelled from web by: Jeff Walton
INSP-Alarm Testing1/17/20081/22/20081/22/2008APART
DetailsForrest France
Reinspection for defficient items at last site visit completed okay, see as-built plans for areas inspected today, noted one address change and two additonal SD to be added due to overspacing.
INSP-Alarm Testing11/13/200711/15/200711/16/2007APART
DetailsForrest France
See as-built plans marked for areas inspected today and noted items in need of revision including door release, adding SD at an electrical room, relocating three SD at the gas bunker, will review approved plans at the next scheduled visit.
FIR-Aging Inspection3/13/20073/13/20073/16/2007 DONE
DetailsForrest France
work in progress