Permit Information
Permit NumberFIR06-00631
StatusFinaled
Name COMMERCIAL FIRE PROTECTION
Site Address 1867 N WILDWOOD AVE
Project NameSTEELWOOD FLEX CONDOS
Customer Number 
ePlanReview 
Description
(STEELWOOD FLEX CONDOS - BUILDING #2) This building is fire sprinklered for fire flow and for future story increase. To create a 1,412 square foot automobile repair garage within a 5,550 square foot, 1 story building. Work is to include a restroom accessible to the disabled, interior nonbearing walls, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 & 24 as regulated by the Fire Department. The proposed fire sprinkler design is solely for the intended tenancy of Boise City Police Department with a protection design for Ordinary Group 2 Occupancy Hazard use as a garage. The work begins @ 10'-0" out from the bldg. where an existing Under Ground gate valve is located. Run 10'-0" of 6" C900 into and stub up within a riser room of 1 hour rated construction.
The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is associated with building permit BLD06-00631.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/25/20071/25/20071/25/2007PPASS
DetailsTroy Cobbley
permit finaled
INSP-Conference1/17/20071/17/20071/18/2007PDONE
DetailsTroy Cobbley
alan is working on the permanant heat issue
INSP-Final Inspection1/15/20071/16/20071/16/2007AFAIL
DetailsTroy Cobbley
Provide correct backflow or data sheet proving friction loss as calculated has not been exceeded. Provide forward flush. Provide permanant heat, insulation above ceiling in the riser room and provide a one hour rated room.
INSP-Sprinkler Rough-in/Hydro1/11/20071/12/20071/12/2007APASS
DetailsTroy Cobbley
overhead hydro and roughin passed.
INSP-Sprinkler Rough-in/Hydro1/9/20071/10/20071/10/2007AFAIL
DetailsTroy Cobbley
The attic sprinkler heads are too close to the deck and a high temp pendant will be required above the unit heater. Hydro test failed due to loss of pressure and now the changes in the attic heads that is required.
INSP-Sprinkler Rough-in/Hydro1/8/20071/9/20071/9/2007PCANC
DetailsTroy Cobbley
To be rescheduled
INSP-Sprinkler Rough-in/Hydro1/8/20071/8/20071/8/2007PCANC
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 1/8/2007 at 9:46:53 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jan 8 2007 10:44AM.
FIR-Aging Inspection12/27/200612/27/200612/27/2006 NR
DetailsTroy Cobbley
work is in progress