INSP-Final Inspection | 12/22/2006 | 12/22/2006 | 12/22/2006 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 12/12/2006 | 12/13/2006 | 12/13/2006 | A | PASS |
Troy Cobbley
|
|
|
The rest of the sprinkler piping is ok to cover
|
INSP-Sprinkler Rough-in/Hydro | 12/7/2006 | 12/8/2006 | 12/8/2006 | A | PASS |
Troy Cobbley
|
|
|
24 hour air test passed.
|
INSP-Sprinkler Rough-in/Hydro | 12/6/2006 | 12/7/2006 | 12/7/2006 | A | PART |
Troy Cobbley
|
|
|
Started 24 hr air test at 9:00am with 40 psi
|
INSP-Sprinkler Rough-in/Hydro | 12/4/2006 | 12/5/2006 | 12/5/2006 | A | PASS |
Troy Cobbley
|
|
|
hydro test for the MRI room piping has passed.
|
INSP-Sprinkler Rough-in/Hydro | 12/1/2006 | 12/4/2006 | 12/4/2006 | A | FAIL |
Troy Cobbley
|
|
|
hydro test failed
|
INSP-Sprinkler Rough-in | 11/29/2006 | 11/29/2006 | 11/29/2006 | P | PASS |
Troy Cobbley
|
|
|
MRI room piping is ok to cover
|
INSP-Sprinkler Rough-in | 11/20/2006 | 11/20/2006 | 11/20/2006 | P | PART |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover in all areas except for MRI room, equipment room and dressing room.
|