INSP-Final Inspection | 10/22/2008 | 10/22/2008 | 10/23/2008 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Final Inspection | 10/22/2008 | 10/22/2008 | 10/22/2008 | A | PASS |
|
|
|
This permit is finaled per Forrest France.
|
INSP-Final Inspection | 2/25/2008 | 2/25/2008 | 2/25/2008 | P | DEFR |
Forrest France
|
|
|
Need plans and permit documents on site.
|
INSP-Sprinkler Rough-in/Hydro | 6/7/2007 | 6/7/2007 | 6/8/2007 | P | PART |
Forrest France
|
|
|
UG hydrostatic test of the fire supply line to the east building passed.
|
INSP-Sprinkler Rough-in | 5/16/2007 | 5/17/2007 | 5/17/2007 | A | PASS |
Troy Cobbley
|
|
|
underground cover inspection passed
|
INSP-Sprinkler Rough-in/Hydro | 2/20/2007 | 2/21/2007 | 2/21/2007 | A | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed. Contractor had to pump system back up to over 200lbs as I waited to begin test.
|
INSP-Sprinkler Rough-in/Hydro | 2/19/2007 | 2/20/2007 | 2/21/2007 | A | CANC |
Troy Cobbley
|
|
|
There is no time to perform inspection
|
INSP-Sprinkler Rough-in/Hydro | 2/1/2007 | 2/2/2007 | 2/2/2007 | A | PART |
Forrest France
|
|
|
Hydrostatic test for the OH FDC piping passed.
|
INSP-Sprinkler Rough-in/Hydro | 1/31/2007 | 2/1/2007 | 2/1/2007 | A | NR |
Forrest France
|
|
|
Per phone call from the subcontractor, system is not ready for hydro at this time, to be rescheduled.
|
INSP-Sprinkler Rough-in/Hydro | 1/30/2007 | 1/31/2007 | 1/31/2007 | P | FAIL |
Forrest France
|
|
|
UG fire supply line hydrostatic test failed due to excessive pressure loss.
|
INSP-Sprinkler Rough-in/Hydro | 1/30/2007 | 1/30/2007 | 1/30/2007 | P | CANC |
Troy Cobbley
|
|
|
Per Terry the test is not ready today because the test pump had a malfunction.
|
INSP-Supply line flush | 1/22/2007 | 1/23/2007 | 1/23/2007 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed for the west buildings.
|
INSP-Sprinkler Rough-in | 1/16/2007 | 1/16/2007 | 1/16/2007 | P | FAIL |
Forrest France
|
|
|
UG fire supply line is NOT approved for cover as the trenches are backfilled to the point that a sufficient inspeciton cannot be performed due to piping concealment. Contractor needs to expose the installation for viewing and request an additional inspection.
|
INSP-Sprinkler Rough-in | 1/10/2007 | 1/10/2007 | 1/10/2007 | P | PART |
Troy Cobbley
|
|
|
See the city approved plans for the area of underground piping that can covered.
|
INSP-Final Inspection | 1/19/2007 | 1/22/2007 | | A | |
|
|
|
John ###-####
|