Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR06-00755
StatusFinaled
Name COMMERCIAL FIRE PROTECTION
Site Address 3210 E AMITY RD
Project NameSPR-Commercial Fire
Customer Number 
ePlanReview 
Description
Run 135’ of 8” C-900 piping into an existing warehouse on the south side of Amity Road to soppy an existing pipe scheduled dry pipe system within. The existing under ground supply will be abandoned. The addition a new 6” Back Flow and the further modification of the existing riser is also within this scope of work. The Under Ground supply and Over Head system Stock Components Bldg. #1 was modified in the same manned for the addition of a back flow device. The fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire “Inspection Card” are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/22/200810/22/200810/23/2008PPASS
DetailsForrest France
UG fire supply line permit finaled.
INSP-Final Inspection10/22/200810/22/200810/22/2008APASS
This permit is finaled per Forrest France.
INSP-Final Inspection2/25/20082/25/20082/25/2008PDEFR
DetailsForrest France
Need plans and permit documents on site.
INSP-Sprinkler Rough-in/Hydro6/7/20076/7/20076/8/2007PPART
DetailsForrest France
UG hydrostatic test of the fire supply line to the east building passed.
INSP-Sprinkler Rough-in5/16/20075/17/20075/17/2007APASS
DetailsTroy Cobbley
underground cover inspection passed
INSP-Sprinkler Rough-in/Hydro2/20/20072/21/20072/21/2007APASS
DetailsTroy Cobbley
Underground hydro test passed. Contractor had to pump system back up to over 200lbs as I waited to begin test.
INSP-Sprinkler Rough-in/Hydro2/19/20072/20/20072/21/2007ACANC
DetailsTroy Cobbley
There is no time to perform inspection
INSP-Sprinkler Rough-in/Hydro2/1/20072/2/20072/2/2007APART
DetailsForrest France
Hydrostatic test for the OH FDC piping passed.
INSP-Sprinkler Rough-in/Hydro1/31/20072/1/20072/1/2007ANR
DetailsForrest France
Per phone call from the subcontractor, system is not ready for hydro at this time, to be rescheduled.
INSP-Sprinkler Rough-in/Hydro1/30/20071/31/20071/31/2007PFAIL
DetailsForrest France
UG fire supply line hydrostatic test failed due to excessive pressure loss.
INSP-Sprinkler Rough-in/Hydro1/30/20071/30/20071/30/2007PCANC
DetailsTroy Cobbley
Per Terry the test is not ready today because the test pump had a malfunction.
INSP-Supply line flush1/22/20071/23/20071/23/2007APASS
DetailsTroy Cobbley
Underground flush passed for the west buildings.
INSP-Sprinkler Rough-in1/16/20071/16/20071/16/2007PFAIL
DetailsForrest France
UG fire supply line is NOT approved for cover as the trenches are backfilled to the point that a sufficient inspeciton cannot be performed due to piping concealment. Contractor needs to expose the installation for viewing and request an additional inspection.
INSP-Sprinkler Rough-in1/10/20071/10/20071/10/2007PPART
DetailsTroy Cobbley
See the city approved plans for the area of underground piping that can covered.
INSP-Final Inspection1/19/20071/22/2007 A 
John ###-####