Permit NumberFIR06-00759
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 121 N 9TH ST
Project NamePLAZA 121-PHASE 2
Customer Number 
ePlanReview 
Description
The scope of work is to install a Class I dry manual standpipe at the S. E. stairwell. A hose valve will be installed on each of the floors as draw on sheet FP-2. A new 3" relief valve will also be installed, with 6" discharge piping to terminate onto the street as it was previously approved. A new test header will also be installed at that same point. This garage is not fire sprinklered. The piped system shall comply with NFPA 14-2003, attached review comment and conditions list, all as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD04-01308.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/16/200711/19/200711/19/2007APASS
DetailsForrest France
Final field testing passed inspection, missing signage at one control valve installed while on site, fire sprinkler permit finaled.
INSP-Final Inspection11/2/200711/2/200711/2/2007PNR
DetailsForrest France
Not ready for final inspection per conversation with contractor.
INSP-Final Inspection8/22/20078/24/20078/24/2007PPART
DetailsForrest France
Pressure relief valve, test header and associated piping install completed satisfactory, final pending functional testing of the PRV.
INSP-Final Inspection8/22/20078/22/20078/23/2007PDEFR
DetailsForrest France
Rescheduled for 8/23
INSP-Sprinkler Rough-in/Hydro12/11/200612/11/200612/11/2006PPART
DetailsForrest France
Hydrostatic test of the new class1 standpipe passed inspection, standpipe installation is satisfactory.