Permit Information
Permit NumberFIR06-00977
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 7960 W RIFLEMAN ST
Project NameTowne Square Station Bldg B
Customer Number 
ePlanReview 
Description
The sprinkler scope of work includes adding 164 down heads into a new wall and ceiling layout on the second floor to accommodate a new tenant space. This work shall be done in accordance with IFC 2003.
The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD06-02534.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/8/20073/8/20073/8/2007PPASS
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in/Hydro2/12/20072/12/20072/12/2007PPASS
DetailsTroy Cobbley
Hydro tests on the 4" riser, 3" riser and the FDC passed
INSP-Sprinkler Rough-in/Hydro2/1/20072/2/20072/2/2007APASS
DetailsTroy Cobbley
24 hour air test on the dry system passed.
INSP-Sprinkler Rough-in/Hydro1/30/20071/31/20071/31/2007APART
DetailsTroy Cobbley
24 hour air test started at 8:45 with 41 psi on the guage
INSP-Sprinkler Rough-in/Hydro1/23/20071/24/20071/24/2007APART
DetailsForrest France
The dry system installation at the west portion of building B is approved for cover, also noted c/n items at the east wing dry system building B have been finished.
INSP-Sprinkler Rough-in/Hydro1/22/20071/22/20071/22/2007PFAIL
DetailsTroy Cobbley
Need additional sprinkler coverage in the southeast corner of the attic and the sway bracing installed on the 2" main. Also the 2x4 trapeze bracing can not be used for the 4" main. This inspection was for the south wing only.
INSP-Sprinkler Rough-in/Hydro1/18/20071/19/20071/19/2007ACANC
DetailsTroy Cobbley
contractor is not ready for inspection
INSP-Sprinkler Rough-in/Hydro1/15/20071/16/20071/16/2007APASS
DetailsTroy Cobbley
The remaining areas of the 2nd floor tenant inprovement are ok to cover.
INSP-Sprinkler Rough-in/Hydro1/10/20071/11/20071/11/2007APART
DetailsTroy Cobbley
The first floor tenant area piping rough-in has passed. The piping below the stairs and into the elevator has not been installed yet. See the plans for the areason the second floor that can be covered.
INSP-Sprinkler Rough-in/Hydro1/8/20071/9/20071/9/2007PPART
DetailsTroy Cobbley
The second floor wet and dry systems were the only areas inspected today. Two uprights are blocked by duct and webbing. The uprights on the dry system need to be aligned with the slope of the roof deck and then there is the insulation issue that needs to be corrected. Also the branchline over the elevator shaft has not been installed.