Permit NumberFIR06-01010
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 415- 419 S 8TH
Project NameSPR-UNGD-OW Smith/R Grey BLNG
Customer Number 
ePlanReview 
Description
O.W. Smith/R. Grey Building - To demolish a portion of an existing warehouse building and to construct a new 31,325 square foot, three story, residential condominium and retail sales building with a 3,310 square foot basement. The basement will contain retail storage area and individual residential storage units. The first floor is 10,770 square feet and contains an approximate 1,030 square foot, four stall parking area, an approximate 4,025 square foot future tenant space, an approximate 4,350 square foot future tenant space and an approximate 1,365 square foot residential common entry and circulation area. The second floor is 10,770 square feet and is planned for 9 residential condominium units. The third floor is 9,785 square feet and is planned for 8 residential condominium units. This building will be constructed of a steel structural frame, concrete floors and masonry and steel stud new and existing exterior walls. This is a shell and core permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this thing for occupancy. All construction per the approved plans and attached comment list. Debest Fire Protection to install 6" fire service supply piping with associated PIV.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/3/20077/5/20077/5/2007APASS
DetailsForrest France
UG fire supply line permit finaled.
INSP-Sprinkler Rough-in5/11/20075/14/20075/14/2007APART
DetailsForrest France
OH hydrostatic test for the 2nd and 3rd floors both passed inspection.
INSP-Sprinkler Rough-in5/8/20075/9/20075/9/2007APART
DetailsForrest France
OH hydrostatic testing for the basement system, standpipe, and FDC piping completed satisfactory.
INSP-Supply line flush3/21/20073/21/20073/21/2007PPART
DetailsForrest France
UG fire supply line flush completed.
INSP-Sprinkler Rough-in/Hydro3/19/20073/19/20073/20/2007PPART
DetailsForrest France
UG fire supply line hydrostatic test passed.
INSP-Sprinkler Rough-in2/6/20072/7/20072/8/2007PPASS
DetailsTroy Cobbley
Underground piping is ok for cover