INSP-Final Inspection | 5/27/2009 | 5/28/2009 | 5/28/2009 | A | PASS |
Forrest France
|
|
|
Remainder of fire alarm work passed functional testing, permit approved for final status.
|
INSP-Alarm Testing | 8/30/2007 | 9/4/2007 | 9/4/2007 | A | PART |
Forrest France
|
|
|
See approved plans for areas tested today, noted some floor plan modifications affecting alarm work, need to add devices as noted, addressing has changed at some locations and is recorded on as-builts.
|
INSP-Alarm Testing | 8/29/2007 | 8/30/2007 | 8/30/2007 | A | CANC |
Forrest France
|
|
|
Overbooked
|
INSP-Alarm Testing | 8/30/2007 | 9/4/2007 | 8/30/2007 | A | CANC |
Forrest France
|
|
|
Forrest,
This is a confirmation of rescheduling a partial inspection of in-patient pharmacy at St. Luke''s Hospital from today to next Tuesday, 9-4-07 due to inspection backlog. Please call for time.
Thanks,
Jim Phone #: ###-#### Internet Inspection Request from: James Shilton Inspection cancelled from web by: James Shilton
|
INSP-Alarm Testing | 3/7/2007 | 3/8/2007 | 3/8/2007 | A | PART |
Forrest France
|
|
|
Fire alarm testing for the area north of the hallway as red lined on approved plans is satisfactory.
|