Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR07-00022
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1112 W MAIN ST Unit: 301
Project NameROYAL PLAZA
Customer Number 
ePlanReview 
Description
This TI in suite #301 includes dropping 15 residential heads into the new wall and ceiling layout of the dwelling unit and 2 other Dry SSP heads on the terrace. The work shall be performed in accordance with NFPA13R installation guidelines. This building is fully fire sprinklered for one-hour substitution. The fire sprinkler system work shall comply with IFC 2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD6-03324.
When tenant work affects fire sprinkler protection outside the permitted work area due to the installation of tenant-demising or new partition walls, the affected area sprinkler coverage outside the BLD permit will fall under the Fire Permit scope of work, to maintain the required fire protection within the fire sprinklered facility. The “Riser” and its supplies which include all appurtenances (including tamper, alarm and alarm monitoring) relating to the normal and correct function and integrity of this system will fall under the jurisdiction for code compliant verification.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/6/200712/6/200712/6/2007PPASS
DetailsForrest France
As-builts accepted, fire sprinkler permit finaled.
INSP-Final Inspection12/5/200712/5/200712/5/2007PPART
DetailsForrest France
Verified corrections have been completed, need to provide two copies of as-built plans.
INSP-Final Inspection11/30/200712/3/200712/3/2007AFAIL
DetailsForrest France
Missing one head in a closet, need as-built plans for field modifications and floor plan changes.
INSP-Sprinkler Rough-in10/29/200710/30/200710/31/2007PDEFR
DetailsForrest France
See inspection notes under the shell permit.
INSP-Sprinkler Rough-in10/25/200710/26/200710/29/2007PPART
DetailsForrest France
Hydro test passed.
INSP-Sprinkler Rough-in/Hydro10/25/200710/26/200710/29/2007PPART
DetailsForrest France
Hydro test passed.
INSP-Sprinkler Rough-in7/16/20077/16/20077/16/2007APART
DetailsForrest France
Noted treated lumber is installed as bracing for ceiling fans above the sheetrock ceiling, requested letter from the electrical contractor stating all wood used for this purpose is fire treated, 3rd floor TI spaces are okay for cover at the hard lid ceilings.
FIR-Aging Inspection7/12/20077/12/20077/13/2007 DONE
DetailsForrest France
Under construction, work in progress.