INSP-Sprinkler Rough-in/Hydro | 3/23/2007 | 3/26/2007 | 3/26/2007 | A | PART |
Forrest France
|
|
|
c/n items verified for compliance, still need as-built plans for field modifications, OH approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 2/27/2007 | 2/28/2007 | 2/28/2007 | A | FAIL |
Forrest France
|
|
|
The min. seperation distance is not met for two pendents at one location, noted added head and one deleted head as well as pipe route changes to be shown on as-built plans.
|
INSP-Sprinkler Rough-in/Hydro | 2/23/2007 | 2/27/2007 | 2/27/2007 | P | FAIL |
Forrest France
|
|
|
Missing approved plans on site.
|