INSP-Final Inspection | 10/12/2007 | 10/12/2007 | 10/12/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 5/1/2007 | 5/2/2007 | 5/2/2007 | A | PASS |
Troy Cobbley
|
|
|
The 1st, 2nd, 3rd and attic hydro test passed. The fdc still needs tested.
|
INSP-Sprinkler Rough-in/Hydro | 4/30/2007 | 5/1/2007 | 5/1/2007 | A | CANC |
Troy Cobbley
|
|
|
Per Leroy the project is not ready for inspection yet. Inspection to be rescheduled.
|
INSP-Sprinkler Rough-in/Hydro | 4/26/2007 | 4/30/2007 | 4/30/2007 | A | FAIL |
Troy Cobbley
|
|
|
Started the wet system hydro test but received a phone call from the fire sprinkler contractor that the second floor piping had a leak. Entire test failed.
|
INSP-Supply line flush | 4/25/2007 | 4/26/2007 | 4/26/2007 | A | PASS |
Troy Cobbley
|
|
|
The underground flush passed
|
INSP-Sprinkler Rough-in | 2/7/2007 | 2/8/2007 | 2/8/2007 | A | PASS |
Troy Cobbley
|
|
|
underground piping ok to cover
|
INSP-Sprinkler Rough-in | 2/5/2007 | 2/6/2007 | 2/6/2007 | A | FAIL |
Troy Cobbley
|
|
|
I stopped at this project twice today. The first time the job shack was locked up and the general contractor and fire sprinkler contractor were not here. The second time I stopped the general contractor was here but he did not have the approved underground plans. He called Shilo and they faxed over unstamped drawings as I waited. I left after telling the general contractor not to cover the trench and to get the approved plans on site.
|