Permit NumberFIR07-00079
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 700 N COLE RD
Project NameCandlewood Suites Hotel
Customer Number 
ePlanReview 
Description
Beginning from an existing tee at the street off North Cole Road, run 6” C-900 pipe trough a NRS valve and then 65’ out and stub up into a new 43,671 ft/2 bldg. The fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire “Inspection Card” are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD06-01695
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/12/200710/12/200710/12/2007PPASS
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in/Hydro5/1/20075/2/20075/2/2007APASS
DetailsTroy Cobbley
The 1st, 2nd, 3rd and attic hydro test passed. The fdc still needs tested.
INSP-Sprinkler Rough-in/Hydro4/30/20075/1/20075/1/2007ACANC
DetailsTroy Cobbley
Per Leroy the project is not ready for inspection yet. Inspection to be rescheduled.
INSP-Sprinkler Rough-in/Hydro4/26/20074/30/20074/30/2007AFAIL
DetailsTroy Cobbley
Started the wet system hydro test but received a phone call from the fire sprinkler contractor that the second floor piping had a leak. Entire test failed.
INSP-Supply line flush4/25/20074/26/20074/26/2007APASS
DetailsTroy Cobbley
The underground flush passed
INSP-Sprinkler Rough-in2/7/20072/8/20072/8/2007APASS
DetailsTroy Cobbley
underground piping ok to cover
INSP-Sprinkler Rough-in2/5/20072/6/20072/6/2007AFAIL
DetailsTroy Cobbley
I stopped at this project twice today. The first time the job shack was locked up and the general contractor and fire sprinkler contractor were not here. The second time I stopped the general contractor was here but he did not have the approved underground plans. He called Shilo and they faxed over unstamped drawings as I waited. I left after telling the general contractor not to cover the trench and to get the approved plans on site.