INSP-Final Inspection | 8/13/2007 | 8/14/2007 | 8/14/2007 | A | PASS |
Troy Cobbley
|
|
|
Permit is finaled.
|
INSP-Final Inspection | 8/9/2007 | 8/13/2007 | 8/13/2007 | P | CANC |
Troy Cobbley
|
|
|
Per the fitter the work is not done yet and the inspection will have to be rescheduled.
|
INSP-Final Inspection | 7/23/2007 | 7/25/2007 | 7/25/2007 | A | NR |
Forrest France
|
|
|
Need shell and core project final prior to tenant permit final request.
|
INSP-Sprinkler Rough-in | 7/17/2007 | 7/17/2007 | 7/17/2007 | P | PART |
Forrest France
|
|
|
Items on c/n verified for compliance, OH rough-in is approved for cover at the drop ceilings.
|
INSP-Sprinkler Rough-in/Hydro | 7/10/2007 | 7/11/2007 | 7/11/2007 | A | FAIL |
Forrest France
|
|
|
Correction notice items are not completed as noted on the previous two inspections, still missing retaining straps at hangers, the added head outside the north common corridor is overspaced, copy room is not finished, noted field changes in the restrooms.
|
INSP-Final Inspection | 7/2/2007 | 7/3/2007 | 7/3/2007 | A | FAIL |
Forrest France
|
|
|
Not all corrections noted at the previous inspection are finished, still missing retaining straps at two locations (server room 221, janitors 203), the copy room and restrooms are not completed, missing coverage outside the common corridor at the north side for shell protection-see approved plans for location.
|
INSP-Sprinkler Rough-in | 6/27/2007 | 6/29/2007 | 6/29/2007 | A | FAIL |
Forrest France
|
|
|
Overspaced heads, one missing upright, missing retaining straps for hangers at several locations, some areas as red lined on plans are not yet completed, install is not approved for cover until corrections are made and re-inspected.
|