INSP-Final Inspection | 5/8/2007 | 5/9/2007 | 5/9/2007 | A | PASS |
Forrest France
|
|
|
Fire sprinkler final inspection passed, permit finaled.
|
INSP-Final Inspection | 5/2/2007 | 5/8/2007 | 5/8/2007 | A | PART |
Forrest France
|
|
|
Still missing ceiling tile at various locations.
|
INSP-Sprinkler Rough-in/Hydro | 4/30/2007 | 5/1/2007 | 5/1/2007 | A | PART |
Forrest France
|
|
|
OH rough-in is acceptable for cover at the remainder of drop ceiling areas within the tenant remodel, noted one leaking joint at the back hallway adjacent to the restroom vestibule.
|
INSP-Sprinkler Rough-in/Hydro | 4/27/2007 | 4/30/2007 | 4/30/2007 | P | DEFR |
Forrest France
|
|
|
Inspection rescheduled.
|
INSP-Sprinkler Rough-in | 4/17/2007 | 4/18/2007 | 4/18/2007 | P | PART |
Forrest France
|
|
|
OH install is approved for cover at areas as red lined and initialed on stamped plans including the kitchen, two restrooms, and two dining rooms, noted armovers supplying drops with static system pressures in excess of 100 psi. to have hangers and surge restraint within 1' of the head, freezer DP are not installed at this time.
|