Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR07-00489
StatusFinaled
Name QUALITY ELECTRIC INC
Site Address 190 E BANNOCK ST
Project NameST LUKES
Customer Number 
ePlanReview 
Description
This fire alarm permit is to replace an older NAC booster panel with a new NAC booster with additional capacity install a new remote annunciator at the nurses station, installation of area smoke detectors as shown on the fire alarm plans, and install notification appliances in for a tenant improvement project on the 9th floor of the St Lukes Hospital Building Permit BLD07-00813 is to remodel approximately 1,900 sq. ft. of existing patient support areas of the existing 19,380 sq. ft. 9th floor, to create a staff lounge / locker room, shower / restroom; create four additional patient rooms; consult, nourishment, exam and work rooms; one fully accessible unisex common restroom and an accessible tub / shower room; to remodel for an enlarged soiled room, a storage room and new nurse station. Install suspended ceiling grid system & hard gypsum lid in remodeled areas per plans; upgrade electrical, mechanical, plumbing, sprinkler & alarm systems; and provide new finishes and millwork. All framing to be non-combustible steel studs with 5/8", type 'X', fire-resistive sheetrock attached to studs. All per plans 'reviewed for code compliance'. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/22/20084/23/20084/23/2008APASS
DetailsForrest France
The remainder of permit work fire alarm testing passed field inspection, permit finaled.
INSP-Final Inspection1/11/20081/14/20081/14/2008APART
DetailsForrest France
See approved set of plans of devices tested. KR
INSP-Final Inspection9/25/20079/27/20079/27/2007ANR
DetailsForrest France
Project is not ready for final inspection per conversation with contractor, to be rescheduled.