INSP-Final Inspection | 10/1/2007 | 10/2/2007 | 10/2/2007 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 10/1/2007 | 10/1/2007 | 10/1/2007 | P | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final inspection, permit finaled.
|
INSP-Sprinkler Rough-in | 8/29/2007 | 8/30/2007 | 8/30/2007 | A | PART |
Forrest France
|
|
|
OH rough in for the second portion of the TI remodel is okay for cover, noted missing ceiling tile and escutcheons at several locations, corrections for the cardio area are complete. Also issued a "Do Not Occupy" order due to occupancy prior to final project completion and acceptance.
|
INSP-Sprinkler Rough-in | 8/28/2007 | 8/29/2007 | 8/29/2007 | P | CANC |
Troy Cobbley
|
|
|
Due to the abundance of inspections today there was not adequate time to perform this one. It will need to be rescheduled.
|
INSP-Final Inspection | 7/25/2007 | 7/26/2007 | 7/26/2007 | A | PART |
Forrest France
|
|
|
Two heads as marked on approved plans exceed spacing limitations, see plans for areas annotated okay for ceiling cover.
|
INSP-Final Inspection | 7/24/2007 | 7/25/2007 | 7/25/2007 | P | CANC |
Forrest France
|
|
|
No time available to complete this inspection today.
|