INSP-Final Inspection | 8/16/2007 | 8/17/2007 | 8/17/2007 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final inspection, permit finaled.
|
INSP-Final Inspection | 8/16/2007 | 8/17/2007 | 8/16/2007 | A | CANC |
Forrest France
|
|
|
Please call 1/2 hour prior to inspection. Charles is the contact, thank you. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 8/10/2007 | 8/14/2007 | 8/14/2007 | A | PART |
Forrest France
|
|
|
Noted corrections for the 1st and 2nd floor have been verified for compliance, remainder of the third floor rough-in is approved for cover.
|
INSP-Sprinkler Rough-in | 8/10/2007 | 8/10/2007 | 8/10/2007 | P | FAIL |
Forrest France
|
|
|
Inspection concluded after 1st and 2nd floors due to the excessive number of defficiencies including overspaced heads, blocked heads, missing retaining straps at beam clamps, mixed temp. heads, mixed k-factors, missing hangers, heads in need of adjustment at drop ceilngs, some heads are still covered with painters tape and paper, etc.
|
INSP-Sprinkler Rough-in | 8/6/2007 | 8/7/2007 | 8/8/2007 | P | PART |
Forrest France
|
|
|
OH rough-in at the 1st floor entry is okay for cover.
|
INSP-Sprinkler Rough-in | 8/1/2007 | 8/3/2007 | 8/3/2007 | A | PART |
Forrest France
|
|
|
Third floor classrooms as noted on approved plans are okay for cover, noted one leaking swing joint to be repaired-see plans for location.
|