Permit Information
Permit NumberFIR07-00578
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 7200 W BARRISTER DR
Project NameADA COUNTY JAIL
Customer Number 
ePlanReview 
Description
Scope of Work:
Add a new wet pipe and an auxiliary anti-freeze system to serve the existing structure shown as Bldg. D. Additional work includes tying in two separate areas as required by the city. (As noted on the plans) The new riser and Anti-freeze system will be supplied from an existing 4” main located in Bldg. A.
The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is not attached to any other permit.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/9/20084/11/20084/11/2008APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection3/20/20083/21/20083/21/2008AFAIL
DetailsTroy Cobbley
Just need to verify the fire proofing has been repaired to final. Forward flush passed.
INSP-Sprinkler Rough-in/Hydro3/19/20083/20/20083/20/2008APASS
DetailsTroy Cobbley
Hydro test passed. Need certification on the new backflow and inspection tag on the anti-freeze system riser. The fire proofing has not been repiared yet.
INSP-Sprinkler Rough-in3/11/20083/12/20083/12/2008APASS
DetailsTroy Cobbley
Need the fire proofing repaired in the storage area and the 401 canopies(heads lowered) installed as per discussion. The galvanized piping/fittings on the roof are ok as per discussion with Brian Johnson.
INSP-Sprinkler Rough-in/Hydro2/20/20082/21/20082/21/2008APASS
DetailsTroy Cobbley
See the city approved plans for the piping that passed rough-in inspection today.
INSP-Sprinkler Rough-in2/19/20082/20/20082/20/2008ACANC
DetailsTroy Cobbley
To be rescheduled for tomorrow morning
INSP-Sprinkler Rough-in1/31/20082/5/20082/5/2008APASS
DetailsTroy Cobbley
See the city approved plans for piping locations approved for cover.
INSP-Sprinkler Rough-in1/23/20081/24/20081/24/2008APASS
DetailsTroy Cobbley
See the city approved plans for the room locations where the piping is ok to cover.
INSP-Sprinkler Rough-in1/10/20081/11/20081/11/2008APASS
DetailsTroy Cobbley
See the city approved plans for piping locations that are ok to cover.
INSP-Sprinkler Rough-in1/2/20081/3/20081/3/2008APASS
DetailsTroy Cobbley
See the city approved plans for locations of piping inspected today.
INSP-Sprinkler Rough-in/Hydro12/18/200712/19/200712/19/2007PPASS
DetailsTroy Cobbley
See the city approved plans for additional rooms where the piping is ok to cover.
INSP-Sprinkler Rough-in12/11/200712/12/200712/12/2007APASS
DetailsTroy Cobbley
See the city approved plans for the two additional rooms where the sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in12/4/200712/6/200712/6/2007APASS
DetailsTroy Cobbley
See the city approved plans for locations where the sprinkler piping can be covered. Todays inspection was for three jail cells.
INSP-Sprinkler Rough-in11/7/200711/8/200711/8/2007APASS
DetailsTroy Cobbley
See the city approved plans for piping locations that are approved for cover. They will have todays date.
INSP-Sprinkler Rough-in11/1/200711/1/200711/2/2007PPASS
DetailsTroy Cobbley
See the city approved plans for the piping locations inspected for today and ok to cover.
INSP-Sprinkler Rough-in9/14/20079/18/20079/18/2007APASS
DetailsTroy Cobbley
See the city approved plans for piping locations where the piping can be covered.