INSP-Final Inspection | 5/21/2008 | 5/21/2008 | 5/21/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 3/28/2008 | 3/31/2008 | 3/31/2008 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro test passed. This included the fdc.
|
INSP-Sprinkler Rough-in/Hydro | 3/27/2008 | 3/28/2008 | 3/28/2008 | P | CANC |
Troy Cobbley
|
|
|
OH Hydro Inspection Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|
INSP-Sprinkler Rough-in/Hydro | 3/26/2008 | 3/27/2008 | 3/27/2008 | P | PASS |
Troy Cobbley
|
|
|
OH Hydro Inspection for the gym area passed.
|
INSP-Sprinkler Rough-in | 3/11/2008 | 3/11/2008 | 3/11/2008 | P | PART |
Troy Cobbley
|
|
|
The upright sprinkler heads are located too far from the lower deck area, at the overbuilds, where the insulation has not been installed. All piping can be covered except at the overbuild areas. One exception is the cafeteria area where Mike, the project superintendant, will provide a photograph of an overbuild area that needs addressed.
|
INSP-Sprinkler Rough-in | 2/21/2008 | 2/22/2008 | 2/22/2008 | A | PART |
Troy Cobbley
|
|
|
See the city approved plans for rough-in piping passed. Areas include the kitchen and cafeteria. Two small overbuilds lack upright sprinkler protection and will require heads. The entry way piping is being changed and will need Brian Johnsons approval prior to installation and inspection.
|
INSP-Sprinkler Rough-in | 2/7/2008 | 2/8/2008 | 2/8/2008 | A | PASS |
Troy Cobbley
|
|
|
The inspection today was only for the two combustible pockets at the east entrance. Both of the pockets have been filled with insulation and can be covered.
|
INSP-Sprinkler Rough-in | 1/25/2008 | 1/28/2008 | 1/28/2008 | A | PASS |
Troy Cobbley
|
|
|
The remaining piping to be inspected is the girls and boys restrooms and cafeteria. The sprinkler drops have not been installed yet either.
|
INSP-Sprinkler Rough-in | 1/24/2008 | 1/25/2008 | 1/25/2008 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler rough-in for the gymnasium is passed. See the plans for the areas to the south of the gym that were inspected. The piping above the mechanical mezzanine was not inspected due to time constraints.
|
INSP-Sprinkler Rough-in | 1/10/2008 | 1/11/2008 | 1/11/2008 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for areas inspected
|
FIR-Aging Inspection | 11/14/2007 | 11/14/2007 | 11/16/2007 | | NR |
Troy Cobbley
|
|
|
work in progress
|