INSP-Final Inspection | 8/21/2007 | 8/21/2007 | 8/21/2007 | P | PASS |
Forrest France
|
|
|
Required corrections have been completed, final inspection passed, fire alarm permit finaled.
|
INSP-Final Inspection | 8/20/2007 | 8/21/2007 | 8/21/2007 | A | FAIL |
Forrest France
|
|
|
One overspaced SD at the third floor corridor as previously noted has not been relocated, the remainder of c/n items are complete.
|
INSP-Final Inspection | 8/16/2007 | 8/20/2007 | 8/20/2007 | A | FAIL |
Forrest France
|
|
|
Noted items in need of correction on stamped plans including overspaced SD, missing horn/strobe, one strobe at the 2nd floor needs to be replaced, addressing on the first floor is incorrect, two SD on the 1st floor relocated while on site, one incorrect cd at a classroom adjusted while on site, need to provide as-builts reflecting field modifications,
|
INSP-Final Inspection | 8/16/2007 | 8/20/2007 | 8/16/2007 | P | CANC |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 8/16/2007 at 12:29:19 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Aug 16 2007 12:44PM.
|
INSP-Conference | 8/7/2007 | 8/8/2007 | 8/8/2007 | A | DONE |
Forrest France
|
|
|
|