INSP-Final Inspection | 6/16/2010 | 6/17/2010 | 6/17/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 11/16/2009 | 11/17/2009 | 11/17/2009 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for defiencies and locations. The plans still need to be resubmitted for a plan modification showing the door magnets and the changes to the a/v circuits.
|
INSP-Final Inspection | 9/11/2008 | 9/12/2008 | 9/12/2008 | A | FAIL |
Troy Cobbley
|
|
|
This inspection only covered the first floor today. See the city approved plans for locations of deficiencies which include old fire alarm devices that have not been removed, dampers that due not operate and a strobe that is mounted too low. Also the fire alarm plans need to be resubmitted showing the access controled egress doors on the east and north sides of the building that are not connected to the fire alarm system as required by IFC chapter 10
|
INSP-Final Inspection | 8/20/2008 | 8/21/2008 | 8/21/2008 | A | FAIL |
Troy Cobbley
|
|
|
There were no city approved drawings on site. I did however go ahead and test the audio/visuals and found one that was not operating. It was replaced and tested prior to me leaving. The spacing and candella have not been checked nor any of the initiating devices.
|
FIR-Aging Inspection | 11/7/2007 | 11/7/2007 | 11/7/2007 | | NR |
Troy Cobbley
|
|
|
Per rick there are still issues with the freight elevator being used as a passenger elevator. But job is nearly ready to go.
|