FIR-Aging Inspection | 12/30/2015 | 12/30/2015 | 12/31/2015 | | PASS |
Troy Cobbley
|
|
|
|
INSP-Final Inspection | 12/31/2015 | 12/31/2015 | 12/31/2015 | P | PASS |
Troy Cobbley
|
|
|
Scope of work for this permit can be finaled. Any future buildings and or new work will be reviewed and inspected under a separate permit. - Scott Arellano
|
INSP-Final Inspection | 9/11/2015 | 9/11/2015 | 9/11/2015 | P | PASS |
Scott Arellano
|
|
|
Scope of work for this permit can be finaled. Any future buildings and or new work will be reviewed and inspected under a separate permit.
|
FIR-Aging Inspection | 9/9/2015 | 9/9/2015 | 9/9/2015 | | NR |
Troy Cobbley
|
|
|
Jeff is going to follow up.
|
FIR-Aging Inspection | 6/1/2015 | 6/1/2015 | 6/1/2015 | | NR |
Troy Cobbley
|
|
|
Waiting for fire sprinkler contractor follow up
|
FIR-Aging Inspection | 6/19/2013 | 6/19/2013 | 6/19/2013 | | DONE |
Forrest France
|
|
|
|
FIR-Aging Inspection | 1/30/2013 | 1/30/2013 | 1/30/2013 | | PASS |
Forrest France
|
|
|
|
FIR-Aging Inspection | 8/27/2012 | 8/27/2012 | 8/28/2012 | | DEFR |
Forrest France
|
|
|
|
FIR-Aging Inspection | 11/22/2011 | 11/22/2011 | 11/22/2011 | | DONE |
Forrest France
|
|
|
Building 1 construction suspended.
|
FIR-Aging Inspection | 6/7/2011 | 6/7/2011 | 6/7/2011 | | DONE |
Forrest France
|
|
|
Construction on building #1 suspended.
|
FIR-Aging Inspection | 3/8/2011 | 3/8/2011 | 3/9/2011 | | DONE |
Forrest France
|
|
|
|
FIR-Aging Inspection | 1/5/2011 | 1/5/2011 | 1/5/2011 | | DONE |
Forrest France
|
|
|
Construction suspended.
|
FIR-Aging Inspection | 10/26/2010 | 10/26/2010 | 10/28/2010 | | DONE |
Forrest France
|
|
|
Construction suspended.
|
FIR-Aging Inspection | 8/18/2010 | 8/18/2010 | 8/19/2010 | | DONE |
Forrest France
|
|
|
Construction suspended.
|
FIR-Aging Inspection | 6/15/2010 | 6/15/2010 | 6/16/2010 | | DONE |
Forrest France
|
|
|
Construction on this project has been suspended.
|
INSP-Sprinkler Rough-in | 1/7/2008 | 1/7/2008 | 1/7/2008 | P | PART |
Forrest France
|
|
|
UG supply line stub out and remote FDC stub to a point 6 feet outside the building stem wall at the east side of the west building are okay for bury.
|
INSP-Final Inspection | 1/24/2012 | 1/24/2012 | | P | |
Forrest France
|
|
|
Lonnie Phone #: ###-####
|