Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR07-00827
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 190 E BANNOCK ST
Project NameST LUKES-S EAST + E ANNEX
Customer Number 
ePlanReview 
Description
Revised Work Scope: Area 2 Revision dated 07/17/08: Modify the existing system by adding and relocating heads to accommodate a new ceiling in the area indicated on the plans as Area 2. This plan modification affected 48 heads. The Permitted Work Scope: Over Head Only
Modify the existing system by adding and relocating heads on the Ground Floor to accommodate a new ceiling layout. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD07-01692.
When tenant work affects fire sprinkler protection outside the permitted work area due to the installation of tenant-demising or new partition walls, the affected area sprinkler coverage outside the BLD permit will fall under the Fire Permit scope of work, to maintain the required fire protection within the fire sprinklered facility. The “Riser” and its supplies which include all appurtenances (including tamper, alarm and alarm monitoring) relating to the normal and correct function and integrity of this system will fall under the jurisdiction for code compliant verification10/25/07 Revised Work Scope:
Modify the existing system by adding and relocating 6 heads on the Ground Floor to accommodate a new ceiling layout. These plans were originally submitted and approved under this same permit. This submittal is due to a plan modification. A Lounge and additional offices were added noted as Rev. 1 dated 10/23/07 This permit is attached to BLD07-01692.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/8/20096/8/20096/8/2009PPASS
DetailsForrest France
Last remaining section per the scope of fire sprinkler work passed rough-in and final inspections, permit approved for final status.
INSP-Sprinkler Rough-in/Hydro6/1/20096/1/20096/2/2009APART
DetailsForrest France
See plan annotations for locations approved.
INSP-Sprinkler Rough-in/Hydro2/2/20092/2/20092/2/2009APART
DetailsForrest France
Reinspection for obstructed pocket corrections passed.
INSP-Sprinkler Rough-in1/6/20091/6/20091/6/2009PPART
DetailsForrest France
Coverage to be adjusted at two obstructed pockets per discussion.
INSP-Sprinkler Rough-in12/29/200812/30/200812/30/2008APASS
DetailsTroy Cobbley
Todays inspection was for a small area in the basement/lower level. See the city approved plans for pendant heads that are marked with "ok". These are ok for cover. There are some overspacing issues but per Don existing walls are coming down and coverage with be restored. I let him know that Forrest or I will need to verify. Also I circled some pockets behind columns where there is no sprinkler protection/floor coverage that will need to be addressed with protection or an exception in the code.
INSP-Sprinkler Rough-in10/9/200810/9/200810/9/2008PPART
DetailsForrest France
OH fire sprinkler system modifications are good for cover at the drop ceilings in the stretcher prep/storage room. See red lined areas on stamped plan set for locations approved.
INSP-Sprinkler Rough-in9/22/20089/23/20089/23/2008APART
DetailsForrest France
Annotations on plan indicate locations okay for cover at the drop ceilings, noted one overspaced head at a patient room to be relocated.
INSP-Sprinkler Rough-in9/19/20089/22/20089/22/2008ANH
DetailsForrest France
Contractor not available on site.
INSP-Sprinkler Rough-in9/18/20089/19/20089/19/2008ACANC
DetailsForrest France
don Phone #: ###-####. Will reschedule for next week. KR
INSP-Sprinkler Rough-in/Hydro9/16/20089/16/20089/16/2008APART
DetailsForrest France
OH rough-in okayed per plan annotations only-see initialed and dated locations.
INSP-Sprinkler Rough-in9/2/20089/2/20089/2/2008APART
DetailsForrest France
Refer to approved plan set for annotations regarding rough-in locations good for cover.
INSP-Sprinkler Rough-in3/19/20083/20/20083/20/2008APART
DetailsForrest France
Okayed for ceiling cover at areas as circled and marked with today's date on stamped plan set.
INSP-Sprinkler Rough-in2/29/20083/3/20083/3/2008APART
DetailsForrest France
OH install is approved for cover as initialed on plans, need verification of pipe routing for the existing 2 1/2" main due to supply and termination points not matching plan set.
INSP-Sprinkler Rough-in/Hydro1/29/20081/30/20081/30/2008APART
DetailsForrest France
See annotations on plan dated 1/28 for areas okayed for cover.
INSP-Sprinkler Rough-in1/25/20081/28/20081/29/2008ACANC
DetailsForrest France
INSP-Sprinkler Rough-in11/27/200711/27/200711/27/2007PPART
DetailsForrest France
Noted on approved plans areas okayed for cover, noted one existing head to be removed and one overspaced head off an adjacent wall.
INSP-Sprinkler Rough-in10/30/200710/31/200710/31/2007APART
DetailsForrest France
Clouded area on approved plans is okay for cover at the drop ceilings, noted field modifications in pipe routing are acceptable.