INSP-Final Inspection | 12/1/2008 | 12/1/2008 | 12/2/2008 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 11/12/2008 | 11/12/2008 | 11/12/2008 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations where the sprinkler piping can be covered.
|
INSP-Final Inspection | 10/20/2008 | 10/20/2008 | 10/20/2008 | A | PART |
Forrest France
|
|
|
See approved plans for locations approved to date.
|
INSP-Sprinkler Rough-in | 8/14/2008 | 8/14/2008 | 8/15/2008 | P | PART |
Forrest France
|
|
|
Hard lid ceilings at eight rooms as marked on plans with today's date are approved for cover.
|
INSP-Sprinkler Rough-in | 4/4/2008 | 4/4/2008 | 4/4/2008 | P | PART |
Forrest France
|
|
|
OK to cover 4 heads, see approved set of city plans for red lined areas.KR
|
INSP-Sprinkler Rough-in | 1/29/2008 | 1/29/2008 | 1/29/2008 | P | PART |
Forrest France
|
|
|
See approvevd set of plans, note areas in red for OK to cover. KR
|
FIR-Aging Inspection | 1/28/2008 | 1/28/2008 | 1/28/2008 | | DEFR |
Forrest France
|
|
|
Work is currently in progress, pending field inspection request to be scheduled 1/29 per conversation with contractor.
|