INSP-Final Inspection | 6/16/2008 | 6/16/2008 | 6/16/2008 | A | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 4/3/2008 | 4/4/2008 | 4/4/2008 | A | DONE |
Forrest France
|
|
|
Under ground hydro completed.Passed. KR
|
INSP-Sprinkler Rough-in/Hydro | 3/3/2008 | 3/3/2008 | 3/3/2008 | P | FAIL |
Forrest France
|
|
|
Wrong permit number called in for inspection, was intended for the project related overhead permit work- Completed a preliminary walkthrough while on site of the narthex and sanctuary area-see approved plans for annotations. Noted main pipe size discrepancy at one area, CPVC piping has been used for several branchlines but no indication is made to that affect on the plans or review notes.
|
INSP-Supply line flush | 2/20/2008 | 2/21/2008 | 2/21/2008 | P | PART |
Forrest France
|
|
|
Under ground flush complete. Hydro test has not been completed. KR
|
INSP-Supply line flush | 2/19/2008 | 2/20/2008 | 2/20/2008 | P | CANC |
Forrest France
|
|
|
Inspection rescheduled per contractor due to coordination with United Water company.
|
INSP-Sprinkler Rough-in | 2/14/2008 | 2/15/2008 | 2/15/2008 | P | PART |
Forrest France
|
|
|
Remainder of of uderground piping ok to cover.KR
|
INSP-Sprinkler Rough-in | 11/1/2007 | 11/2/2007 | 11/2/2007 | A | PASS |
Troy Cobbley
|
|
|
The underground from the inside stubin to 16' out is ok to cover. See the city approved plans for piping.
|