INSP-Final Inspection | 11/28/2007 | 11/29/2007 | 11/29/2007 | A | PASS |
Forrest France
|
|
|
Correction is complete, fire sprinkler permit finaled.
|
INSP-Final Inspection | 11/27/2007 | 11/28/2007 | 11/28/2007 | A | FAIL |
Troy Cobbley
|
|
|
Sprinkler coverage is missing in the closet located in the corridor.
|
INSP-Sprinkler Rough-in | 10/30/2007 | 10/30/2007 | 10/30/2007 | P | PART |
Forrest France
|
|
|
Required corrections have been made, overhead install is approved for cover at the drop ceilings.
|
INSP-Final Inspection | 10/26/2007 | 10/26/2007 | 10/26/2007 | P | FAIL |
Forrest France
|
|
|
Missing coverage at one closet, hangers at two arm-overs are overspaced.
|