INSP-Final Inspection | 3/20/2008 | 3/21/2008 | 3/21/2008 | A | PASS |
Troy Cobbley
|
|
|
Hood inspections complete.Repairs corrected per last inspection.KR
|
INSP-Final Inspection | 2/12/2008 | 2/12/2008 | 2/12/2008 | P | FAIL |
Troy Cobbley
|
|
|
Per ANSUL the nozzles in the ducting need approval from them prior to acceptance of the hood. The nozzles in the duct are installed at the top where as the installation guide and past installs the nozzles are installed at the bottom of the duct. Ken took pictures of the installation and will email them to his contact at ANSUL corporate. This was done to facilitate the approval of this permit for the fire suppression contractor and provide clarification to the inspectors.
|
INSP-Final Inspection | 1/30/2008 | 1/30/2008 | 1/30/2008 | P | FAIL |
Troy Cobbley
|
|
|
Nozzles had not been installed in the plenum as required by Ansul. Inspection was stopped until this work is completed on both hoods.
|