Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR07-00977
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 199 N CAPITOL BLVD Unit: 300
Project NameSPR-WASHINGTON MUTUAL BLDG
Customer Number 
ePlanReview 
Description
Relocating 6 existing SSP's and changing out 3 SSP's to accomodate new tenant modifications. The building fire sprinkler system includes a fire pump. This fire sprinkler work is associated with BLD07-02576.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/15/20082/19/20082/19/2008APASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Sprinkler Rough-in2/14/20082/15/20082/15/2008APART
DetailsForrest France
Conference room heads at the drop ceiling are approved for cover.
INSP-Sprinkler Rough-in12/14/200712/14/200712/17/2007PPART
DetailsForrest France
OH rough-in at the hard lid soffits and ceilings is approved for cover.
INSP-Sprinkler Rough-in12/7/200712/10/200712/10/2007APART
DetailsForrest France
Okay for cover at the hard lid ceilings as indicated on approved plans initialed with today's date.