INSP-Final Inspection | 1/22/2008 | 1/22/2008 | 1/22/2008 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit okay for final, field ceiling tile to be installed today per contractor-verified at structural final.
|
INSP-Sprinkler Rough-in | 1/17/2008 | 1/17/2008 | 1/17/2008 | P | PART |
Forrest France
|
|
|
Overhead fire sprinkler work is approved for cover at the drop ceiling areas.
|
INSP-Sprinkler Rough-in | 1/11/2008 | 1/11/2008 | 1/11/2008 | P | FAIL |
Troy Cobbley
|
|
|
Upright protection has been added only at the locations where the combustibles are. The combustible do not meet the definition of nfpa 13 8.14.1.5 (1). Provide upright protection throughout the attic space and resubmit plans showing the additional heads.
|
INSP-Sprinkler Rough-in | 1/7/2008 | 1/8/2008 | 1/8/2008 | P | FAIL |
Forrest France
|
|
|
Missing coverage for combustible construction at the spaces above the drop ceiling.
|