DOC - Permit Finaled | | | 7/2/2008 | | DONE |
|
|
|
Fire Life safety passed by Troy Cobbley on 6-5-08 BAS
|
INSP-Final Inspection | 5/30/2008 | 6/2/2008 | 6/2/2008 | A | CANC |
Troy Cobbley
|
|
|
Jeremiah, please call 30 minutes prior; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
INSP-Sprinkler Rough-in/Hydro | 5/13/2008 | 5/14/2008 | 5/14/2008 | A | PASS |
Troy Cobbley
|
|
|
24 hr air test passed
|
INSP-Sprinkler Rough-in/Hydro | 5/12/2008 | 5/13/2008 | 5/13/2008 | P | PASS |
Troy Cobbley
|
|
|
24 hr air test started at 10:30 with 43psi on the guage.
|
INSP-Sprinkler Rough-in/Hydro | 2/19/2008 | 2/20/2008 | 2/20/2008 | P | PASS |
Troy Cobbley
|
|
|
The wet system and dry system hydro tests passed.
|
INSP-Sprinkler Rough-in/Hydro | 2/15/2008 | 2/15/2008 | 2/15/2008 | P | FAIL |
Troy Cobbley
|
|
|
The inspection was for above ground hydo tests. The dry system had lost pressure prior to me arriving. I also that the FDC was not being hydro as required. The wet system did have over 200 lbs. The fitter and I decided that all of the testing for buildings 1 and 2 as well as the rough in for buidling 2 will happen on wednesday.
|
INSP-Sprinkler Rough-in/Hydro | 2/12/2008 | 2/12/2008 | 2/12/2008 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping is ok to cover. Per a verbal agreement with the general contractor the overbuild areas wont be covered until I can verify that they are full of insulation as per the approved plans.
|
INSP-Sprinkler Rough-in | 2/5/2008 | 2/7/2008 | 2/7/2008 | A | PART |
Troy Cobbley
|
|
|
The overbuilds need to be filled with insulation as per the approved drawings. A hanger/block assembly on the wet system needs replaced. Tenting needs repaired. The inspectors test for the dry system needs to be located at the end of the most remote branchline as stated in NFPA 13 8.16.4
|