Permit Information
Permit NumberFIR07-01041
StatusFinaled
Name IDAHO FIRE PROTECTION
Site Address 1199 W SHORELINE Unit: DR
Project NameRIVER PARK BLDG
Customer Number 
ePlanReview 
Description
Work Scope: Over Head Only
Reinstall 14 SSP heads to complete coverage on the first floor where the original heads were removed to accommodate a Halon System.. Four additional heads will be relocated to accommodate a new ceiling layout. A mechanical tee will be added were necessary to supply a new head location. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD07-0318. The Halon system DEMO shall not be performed under this permit. A separate DEMO permit is required prior to starting DEMO work.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/16/20104/16/20104/16/2010PPASS
DetailsForrest France
Scope of fire sprinkler permit work finaled.
INSP-Final Inspection3/9/20103/9/20103/12/2010PPART
DetailsForrest France
Scope of permit work appears satisfactory, however noted non-compliant spacing at an adjacent training room indicated as "OK" on plans.
INSP-Final Inspection12/18/200812/18/200812/18/2008ANR
DetailsForrest France
Project is not ready for final at this time.
INSP-Sprinkler Rough-in/Hydro10/29/200810/29/200810/29/2008PPART
DetailsForrest France
OH rough-in approved as noted on plans for cover.
INSP-Sprinkler Rough-in/Hydro5/2/20085/5/20085/5/2008APART
DetailsForrest France
OH rough-in is approved for cover at the drop ceilings for the remainder of install as marked and initialed with today's date on approved plan set.
INSP-Sprinkler Rough-in/Hydro5/1/20085/2/20085/2/2008ACANC
DetailsForrest France
Scheduled by a contractor via Hello! on 5/1/2008 at 12:02:49 PM. Contact: ###-####. Inspection rescheduled per phone conversation with contractor.
INSP-Sprinkler Rough-in/Hydro3/3/20083/4/20083/4/2008APART
DetailsForrest France
Fire sprinkler system modifications are approved for cover at the drop ceiling areas only as circled and initialed on plans with todays date, some rooms are not yet completed for inspection at this time.