INSP-Final Inspection | 3/24/2008 | 3/25/2008 | 3/25/2008 | A | PASS |
Forrest France
|
|
|
Fire alarm testing passed, main entry door mag lock interconnection to the FACP also tested, permit finaled.
|
INSP-Final Inspection | 3/21/2008 | 3/24/2008 | 3/24/2008 | A | NR |
Forrest France
|
|
|
Per contractor work is not ready for inspection due to HVAC difficulties.
|
INSP-Conference | 3/17/2008 | 3/17/2008 | 3/17/2008 | P | DONE |
Forrest France
|
|
|
On site visit regarding duct detector locations.
|