INSP-Final Inspection | 5/30/2008 | 5/30/2008 | 5/30/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 5/27/2008 | 5/28/2008 | 5/28/2008 | A | FAIL |
Troy Cobbley
|
|
|
Provide factory verification that the duct smoke detector at address 45 can be located as installed. All other items are complete.
|
INSP-Final Inspection | 5/21/2008 | 5/22/2008 | 5/22/2008 | A | FAIL |
Troy Cobbley
|
|
|
Provide modifications to the attic area a/v's as discussed to meet code requirements. Need to test the duct smoke detectors and in-duct detectors in heat mode to verify shutdown. Many of the main level a/v's are not using temporal but are sounding with two pulses the same time as other are doing the temporal. The a/v in room 202 is overspaced. As-builts will be needed prior to sign off of this permit.
|
INSP-Final Inspection | 5/20/2008 | 5/21/2008 | 5/21/2008 | A | FAIL |
Troy Cobbley
|
|
|
The sprinkler interconnections were tested today. The tamper switches had to be adjusted so they would activate correctly. The riser waterflow switches and tamper switches need to be relabeled so that they matched the sprinkler contractors designations as sprinkler riser 1 and sprinkler riser 2. The horn in the electrical room was not sounding in a temporal pattern. After all of that was fixed I spent the remaining time testing all of the manual pull stations.
|