INSP-Final Inspection | 8/12/2008 | 8/12/2008 | 8/12/2008 | P | PASS |
Troy Cobbley
|
|
|
Final inspection completed. KR
|
INSP-Sprinkler Rough-in | 7/9/2008 | 7/10/2008 | 7/10/2008 | A | PART |
Forrest France
|
|
|
The remainder of overhead fire sprinkler system modifications are approved for cover at the drop ceilings throughout the remodel area.
|
INSP-Sprinkler Rough-in | 6/18/2008 | 6/18/2008 | 6/18/2008 | P | PART |
Forrest France
|
|
|
See areas on stamped plan set okayed for cover at the drop ceilings, noted two heads alternately spaced from plan locations.
|
INSP-Sprinkler Rough-in | 5/19/2008 | 5/19/2008 | 5/19/2008 | P | PART |
Troy Cobbley
|
|
|
See the city approved plans for the area that is approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 4/23/2008 | 4/23/2008 | 4/23/2008 | P | DEFR |
Forrest France
|
|
|
Not completed for inspection at this time.
|