INSP-Final Inspection | 9/19/2008 | 9/19/2008 | 9/19/2008 | A | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Conference | 9/12/2008 | 9/15/2008 | 9/15/2008 | A | DONE |
Forrest France
|
|
|
Craig with CM company will the person you will be meeting with. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus
|
INSP-Conference | 9/8/2008 | 9/9/2008 | 9/10/2008 | P | DONE |
Forrest France
|
|
|
On site visit regarding SW head locations and project scheduling.
|
INSP-Sprinkler Rough-in/Hydro | 8/5/2008 | 8/5/2008 | 8/5/2008 | P | PART |
Forrest France
|
|
|
UG fire supply line and remote FDC piping passed hydrostatic testing.
|
INSP-Sprinkler Rough-in/Hydro | 8/1/2008 | 8/4/2008 | 8/4/2008 | A | NR |
Forrest France
|
|
|
UG hydrostatic test not yet ready for inspection.
|
INSP-Supply line flush | 8/1/2008 | 8/4/2008 | 8/4/2008 | A | PART |
Forrest France
|
|
|
UG fire supply line and remote FDC piping flush completed satisfactory.
|
INSP-Sprinkler Rough-in | 6/9/2008 | 6/10/2008 | 6/10/2008 | A | PART |
Forrest France
|
|
|
UG fire supply line, PIV, remote FDC piping and ductile stub in at the riser are okay for cover, portions of piping already concealed were uncovered and exposed on site per request, line bedding is acceptable.
|