Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR08-00299
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 700 N ANCESTOR PL
Project NameSuperValu Westpark Data Center
Customer Number 
ePlanReview 
Description
FIR OH Work Scope:
The contractor will relocate existing heads in system to accommodate a new wall and ceiling layout. The contractor will also install two Double Interlock preaction system in the new 16,150-ft/a addition to serve through out. The existing 6” FDC piping will be extended out into the new addition and tied into the new preaction riser manifold. The existing FDC will remain. The fire sprinkler system work shall comply with the IFC 2006, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD07-03132 & UG permit FIR08-00158.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/24/200812/29/200812/29/2008APASS
DetailsTroy Cobbley
Permit finaled.
INSP-Final Inspection12/23/200812/24/200812/24/2008APART
DetailsForrest France
Functionality testing of the new and existing preaction risers completed today, PIV tamper at the west side needs adjustment, outside bell is not operational at the east side risers.
INSP-Final Inspection12/17/200812/19/200812/19/2008ACANC
DetailsTroy Cobbley
Russ Phone #: ###-####
INSP-Sprinkler Rough-in11/5/200811/6/200811/6/2008APASS
DetailsTroy Cobbley
See the city approved plans for areas where the sprinkler piping can be installed.
INSP-Sprinkler Rough-in/Hydro11/4/200811/5/200811/5/2008APASS
DetailsTroy Cobbley
See approved plans for areas where the sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in/Hydro10/1/200810/2/200810/2/2008APASS
DetailsTroy Cobbley
24 hour air test passed for both systems
INSP-Sprinkler Rough-in9/30/200810/1/200810/1/2008ADONE
DetailsTroy Cobbley
Start of the 24 hour air test with 41.5 psi on the left system riser and 43 psi on the right system riser.
INSP-Sprinkler Rough-in/Hydro9/29/20089/30/20089/30/2008APASS
DetailsTroy Cobbley
The piping to three additional pendant heads, as marked on the plans, is ok to cover.
INSP-Sprinkler Rough-in/Hydro9/26/20089/29/20089/29/2008APASS
DetailsTroy Cobbley
Overhead hydro test passed for both systems.
INSP-Sprinkler Rough-in/Hydro9/17/20089/17/20089/17/2008PPASS
DetailsTroy Cobbley
See the city approved plans for locations where the sprinkler piping can be covered.
INSP-Sprinkler Rough-in/Hydro8/4/20088/5/20088/5/2008APART
DetailsTroy Cobbley
The rough-in inspection is passed. None of the arm-overs have been installed yet and will require an additional rough-in inspection to verify hangers for the arm-overs.