INSP-Final Inspection | 9/18/2008 | 9/19/2008 | 9/19/2008 | A | PASS |
Forrest France
|
|
|
As-built plans provided reflecting field modifications accepted, items on correction notice completed, some items finished while on site including added sw at the head box and drain piping at the antifreeze RP. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 9/18/2008 | 9/18/2008 | 9/18/2008 | P | FAIL |
Forrest France
|
|
|
Yard PIV is installed too low, need to provide correct spacing and matched temperature SW heads at the lions den, min. spacing at six upright heads in the kitchen and vending area is exceeded, noted three added heads for exterior canopies have been installed on the antifreeze system that do not show on approved plans, also noted re-routed 2 1/2" main, missing sw stock at the head box, missing outside bell. Forward flow completed okay.
|
INSP-Sprinkler Rough-in/Hydro | 9/17/2008 | 9/18/2008 | 9/18/2008 | A | PART |
Forrest France
|
|
|
OH hydrostatic testing passed.
|
INSP-Final Inspection | 9/17/2008 | 9/18/2008 | 9/18/2008 | P | CANC |
Forrest France
|
|
|
Mike B is the contact. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 7/29/2008 | 7/30/2008 | 7/30/2008 | A | PART |
Forrest France
|
|
|
OH rough-in is approved for cover at the hard lid ceilings per red line plan annotations initialed with todays date at the school room #401.
|
INSP-Sprinkler Rough-in | 7/23/2008 | 7/24/2008 | 7/24/2008 | A | PART |
Forrest France
|
|
|
Hard lid ceilings at the mens and womens restroom only are okay for cover pending approved plans match piping install, also okayed brace at the 4" main adjacent to the lion's den. Discussed UG flusing and hydro testing schedule.
|
INSP-Sprinkler Rough-in | 7/23/2008 | 7/23/2008 | 7/23/2008 | P | NR |
Forrest France
|
|
|
Not ready for inspection per contractor.
|