Permit Information
Permit NumberFIR08-00413
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 9050 W OVERLAND RD Unit: 100
Project NameANDERSON BLACK EAGLE
Customer Number 
ePlanReview 
Description
overhead FIR Work Scope:
The Fire Sprinkler scope consists of adding and relocating heads on the first & second floors to accommodate a new wall & ceiling lay out. This modification does not appear to adversely affect the operation of the system The fire sprinkler system work shall comply with the IFC 2006, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD08-00984.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/21/20088/21/20088/21/2008PPASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection8/13/20088/14/20088/14/2008APART
DetailsTroy Cobbley
A temporary occupancy was given with Sam Rogers permission until the revised fire alarm plans showing the additional NAC panel have been approved and a field inspection verifies compliance with the new drawings. I tested the new NAC panel and it functioned correctly.
INSP-Final Inspection8/8/20088/8/20088/8/2008PFAIL
DetailsTroy Cobbley
Will be ready to final when all of the ceiling tile is installed.
INSP-Sprinkler Rough-in/Hydro8/5/20088/6/20088/6/2008APASS
DetailsTroy Cobbley
The remaining second floor rooms at the elevator are ok to cover.
INSP-Final Inspection8/5/20088/6/20088/6/2008AFAIL
DetailsTroy Cobbley
Project is not ready for final inspection
INSP-Sprinkler Rough-in7/30/20087/31/20087/31/2008APASS
DetailsTroy Cobbley
The remaining piping on the second floor is ok to cover except for the two rooms immediately adjacent to the elevator. The hydro test passed as well.
INSP-Sprinkler Rough-in/Hydro7/16/20087/16/20087/16/2008PPASS
DetailsTroy Cobbley
Hydro Inspection of the first floor and the remaining first floor sprinkler piping is ok to cover. The second floor needs to be completed.
INSP-Sprinkler Rough-in/Hydro7/11/20087/14/20087/14/2008PPASS
DetailsTroy Cobbley
See the city approved plans for the rooms where the sprinkler piping can be covered.