INSP-Final Inspection | 12/17/2010 | 12/20/2010 | 12/20/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
FIR-Aging Inspection | 12/13/2010 | 12/13/2010 | 12/16/2010 | | NR |
Troy Cobbley
|
|
|
Per Jim Danes this work will be finished when another permit in this same building is called in for an inspection possibly next week.
|
FIR-Aging Inspection | 3/17/2010 | 3/17/2010 | 3/18/2010 | P | FAIL |
Forrest France
|
|
|
Missing one pendent sprinkler head at the first floor stairway landing south side, remainder of permit work is acceptable.
|
INSP-Sprinkler Rough-in/Hydro | 6/24/2008 | 6/25/2008 | 6/25/2008 | A | PART |
Forrest France
|
|
|
C/N items repaired, OH fire sprinkler system modifications for the tenant area are approved for cover at the drop ceilings.
|
INSP-Sprinkler Rough-in/Hydro | 6/24/2008 | 6/24/2008 | 6/24/2008 | P | FAIL |
Forrest France
|
|
|
See plans for marked defficient areas including overspaced pendent heads at the south stairway, one missing hanger, also noted sidewinder sammy screws must be installed per mfg. listing (see plan hanger detail) and cannot be fastened to the narrow demention of the truss cord-eight locations.
|
INSP-Sprinkler Rough-in/Hydro | 6/23/2008 | 6/23/2008 | 6/23/2008 | A | NR |
Forrest France
|
|
|
Jim Phone #: ###-####
|