INSP-Final Inspection | 3/26/2009 | 3/26/2009 | 3/26/2009 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Supply line flush | 11/10/2008 | 11/10/2008 | 11/10/2008 | P | DONE |
Troy Cobbley
|
|
|
Under ground flush completed. KR
|
INSP-Sprinkler Rough-in/Hydro | 10/1/2008 | 10/1/2008 | 10/1/2008 | P | PASS |
Forrest France
|
|
|
Underground hydro completed. KR
|
INSP-Sprinkler Rough-in/Hydro | 9/15/2008 | 9/15/2008 | 9/15/2008 | A | PART |
Forrest France
|
|
|
UG supply line okayed for cover.
|
INSP-Sprinkler Rough-in | 8/28/2008 | 8/29/2008 | 8/29/2008 | P | PART |
Forrest France
|
|
|
UG fire supply line stub out including the tee connection and thrust block are okay for cover, bedding material to be provided as discussed.
|
INSP-Sprinkler Rough-in | 8/28/2008 | 8/28/2008 | 8/28/2008 | P | FAIL |
Forrest France
|
|
|
Need to provide missing thrust block at one location.
|
INSP-Sprinkler Rough-in | 8/19/2008 | 8/20/2008 | 8/20/2008 | A | PART |
Troy Cobbley
|
|
|
The 8" stub out is ok to bury. The remaining underground piping to be inspected when complete.
|