INSP-Final Inspection | 1/5/2010 | 1/5/2010 | 1/6/2010 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit final approved.
|
INSP-Final Inspection | 12/28/2009 | 12/29/2009 | 12/29/2009 | A | FAIL |
Forrest France
|
|
|
Heads at new 401 canopies have been installed via a series of 1/2" brass nipple extenders. See NFPA 13 2007 8.15.19.1.
|
INSP-Final Inspection | 12/23/2009 | 12/23/2009 | 12/23/2009 | P | FAIL |
Tim Frost
|
|
|
Inspection failed due to 3 sprinklers that were blocked by lighting fixture. One of the sprinkler was also bent or installed crooked.
|
INSP-Sprinkler Rough-in/Hydro | 12/3/2009 | 12/3/2009 | 12/3/2009 | P | NR |
Forrest France
|
|
|
|
INSP-Final Inspection | 9/1/2009 | 9/2/2009 | 9/4/2009 | A | NR |
Forrest France
|
|
|
Project is not in condition for final at this time due to incompleted construction finishes, noted one SW head too far below the ceiling, and a missing head at a mechanical closet.
|
INSP-Final Inspection | 8/25/2009 | 8/26/2009 | 8/26/2009 | A | FAIL |
Troy Cobbley
|
|
|
One pendant in the master bath is overspaced from west wall, need ceiling and pendant installed in furnance room and the permanent lighting needs installed.
|
INSP-Sprinkler Rough-in/Hydro | 6/22/2009 | 6/23/2009 | 6/23/2009 | A | PART |
Forrest France
|
|
|
Overhead rough-in okayed for cover, one upright head removed while on site, be aware of possible light fixture obstructions due to junction box locations and pendent heads.
|
FIR-Aging Inspection | 10/21/2008 | 10/21/2008 | 10/21/2008 | | DONE |
Forrest France
|
|
|
Work in progress, construction underway.
|