Permit Information
Permit NumberFIR08-00504
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 7557 W USTICK RD
Project NameWest Branch Public Library
Customer Number 
ePlanReview 
Description
Scope of Work: UG Only
Beginning from a 6” tap off an existing 8” main UG / Gate valve (by Capitol Water) located @ the property line off of west side. From the gate valve, run 47 lf of 6” C900 out and rise up into the riser room of a new 14,860-ft/2 single story structure. The fire sprinkler underground work shall comply with NFPA 13-2007, NFPA 24-2007 the IFC-2006, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire “Inspection Card” are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD08-00475. The overhead will be submitted under a separate permit.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/12/20096/12/20096/12/2009PPASS
DetailsTroy Cobbley
permit finaled
INSP-Supply line flush3/24/20093/25/20093/25/2009PPASS
DetailsTroy Cobbley
The flush of the underground supply line passed.
INSP-Sprinkler Rough-in/Hydro2/12/20092/13/20092/13/2009APASS
DetailsTroy Cobbley
The underground hydro passed
INSP-Sprinkler Rough-in/Hydro12/19/200812/22/200812/22/2008ACANC
DetailsForrest France
Jared is the contact. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in9/8/20089/9/20089/9/2008APASS
DetailsTroy Cobbley
The remaining 6" underground supply is ok to cover and has been installed as per plans.
INSP-Sprinkler Rough-in/Hydro8/28/20088/28/20088/28/2008PPASS
DetailsTroy Cobbley
UG Stub out inspection for the first 20' of 6" pipe passed. This portion of the piping is installed as per the plans. The remaining piping has not been installed.