Scope of Work: UG Only - Shilo scope will begin from a 6” tap off an existing 12” circulating loop main UG / Gate valve (by United Water) located @ the property line off of E. Entertainment. From the gate valve, run 117 lf. of 6” C900 out and rise up into the riser room of a new 8000-ft/2 single story structure with 6” DI class 50. The fire sprinkler underground work shall comply with NFPA 13-2007, NFPA 24-2007 the IFC-2006, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire “Inspection Card” are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD08-00896. The overhead will be submitted under a separate permit.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/9/20092/10/20092/10/2009PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Supply line flush10/29/200810/30/200810/30/2008APART
DetailsForrest France
UG fire supply line flush completed satisfactory.
INSP-Supply line flush10/13/200810/14/200810/14/2008PCANC
DetailsTroy Cobbley
To be canceled per Lee Thompson
INSP-Sprinkler Rough-in/Hydro10/13/200810/14/200810/14/2008PCANC
DetailsTroy Cobbley
To be canceled per Lee Thompson
INSP-Sprinkler Rough-in/Hydro10/13/200810/13/200810/13/2008PPASS
DetailsTroy Cobbley
The underground hydro test passed.
INSP-Supply line flush10/10/200810/13/200810/13/2008PCANC
DetailsTroy Cobbley
Lee Thompson is your contact. Thanks. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in/Hydro10/10/200810/13/200810/13/2008PCANC
DetailsTroy Cobbley
Lee Thompson is your contact. Thanks. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in/Hydro8/15/20088/18/20088/18/2008APASS
DetailsTroy Cobbley
The underground supply line is ok to bury. The installation matches plans except that a 45 degree elbow as shown on the plans has been deleted with only the 90 elbow turning into the building remaining.