INSP-Final Inspection | 2/9/2009 | 2/10/2009 | 2/10/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Supply line flush | 10/29/2008 | 10/30/2008 | 10/30/2008 | A | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Supply line flush | 10/13/2008 | 10/14/2008 | 10/14/2008 | P | CANC |
Troy Cobbley
|
|
|
To be canceled per Lee Thompson
|
INSP-Sprinkler Rough-in/Hydro | 10/13/2008 | 10/14/2008 | 10/14/2008 | P | CANC |
Troy Cobbley
|
|
|
To be canceled per Lee Thompson
|
INSP-Sprinkler Rough-in/Hydro | 10/13/2008 | 10/13/2008 | 10/13/2008 | P | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed.
|
INSP-Supply line flush | 10/10/2008 | 10/13/2008 | 10/13/2008 | P | CANC |
Troy Cobbley
|
|
|
Lee Thompson is your contact. Thanks. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 10/10/2008 | 10/13/2008 | 10/13/2008 | P | CANC |
Troy Cobbley
|
|
|
Lee Thompson is your contact. Thanks. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 8/15/2008 | 8/18/2008 | 8/18/2008 | A | PASS |
Troy Cobbley
|
|
|
The underground supply line is ok to bury. The installation matches plans except that a 45 degree elbow as shown on the plans has been deleted with only the 90 elbow turning into the building remaining.
|