Permit Information
Permit NumberFIR08-00517
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 401 W FRONT ST
Project NameBELLA PLAZA OFFICE BLDG
Customer Number 
ePlanReview 
Description
FIR OH Work Scope:
The fire sprinkler scope consists of modifying the existing wet pipe system by adding and relocating down heads on the 4th, 5th and 6th floors to accommodate a new wall and ceiling layout in suites 401, 500 and 600. The fire sprinkler system alterations / work shall comply with the IFC 2006 & NFPA 13, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD08-01294.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/31/200812/31/200812/31/2008PPASS
DetailsForrest France
Fire sprinkler permit okay for final.
INSP-Final Inspection9/30/20089/30/20089/30/2008PPART
DetailsForrest France
Correction notice items verified for completion, final pending field ceiling tile at conference rooms on the 4th, 5th and 6th floors.
INSP-Final Inspection9/29/20089/29/20089/29/2008PFAIL
DetailsForrest France
Final pending installation of five missing escutcheons at the 6th floor, replace one damaged pendent head on the 4th floor, replace one painted head at the 4th floor, missing field tile at several rooms on 4th, 5th and 6th floors.
INSP-Final Inspection9/26/20089/26/20089/26/2008PFAIL
DetailsTroy Cobbley
This inspection was for the 4th and 5th floors. Replace the painted sprinkler heads on the 5th floor, provide the missing canopies for all of the heads on the 4th and 5th floors, remove the "tin foil" from the heads on the 4th and 5th floors
INSP-Sprinkler Rough-in/Hydro9/18/20089/18/20089/19/2008PPART
DetailsForrest France
5th floor overhead rough-in at the grid ceilings is approved for cover.
INSP-Sprinkler Rough-in/Hydro9/17/20089/17/20089/17/2008PFAIL
DetailsForrest France
5th floor overhead cover is not approved at this time due to painted upright heads at several locations, noted one missing head and one overspaced head at the 6th floor-see plans for locations.
INSP-Sprinkler Rough-in/Hydro9/12/20089/15/20089/15/2008APART
DetailsForrest France
4th floor overhead fire sprinkler work is approved for cover at the drop ceilings.
INSP-Sprinkler Rough-in/Hydro9/4/20089/5/20089/5/2008APART
DetailsTroy Cobbley
Rough In 4th Floor is passed but the sprinkler piping can not be covered until the tape has been removed from the existing sprig-ups. Also see the city approved plans for a location where an additional upright is required due to a full height wall.
INSP-Sprinkler Rough-in/Hydro8/26/20088/27/20088/27/2008APART
DetailsForrest France
Okayed work above sheetrock ceilings and soffits for the 6th floor-noted three heads in hard lids not yet finished, piping to be installed per plan at grid ceilings.
INSP-Sprinkler Rough-in/Hydro8/18/20088/19/20088/19/2008PPART
DetailsForrest France
OH install at the restroom, lounge and elevator lobby sheetrock lid ceilings is okay for cover, one head in a wall to be relocated, pendent heads at hard lid soffits are okay pending two heads supplied by a single one inch outlet is approved.
INSP-Sprinkler Rough-in/Hydro8/15/20088/15/20088/15/2008APART
DetailsForrest France
See plans for areas okayed to cover at the 4th floor.
INSP-Sprinkler Rough-in/Hydro8/12/20088/14/20088/14/2008APART
DetailsForrest France
Inspection for the 4th floor hard lid areas and soffits completed today-okayed for cover at these locations only. Noted blocked upright protection at the NE corner of the reception room-see annotations on approved plan set.