INSP-Final Inspection | 9/29/2008 | 9/29/2008 | 9/29/2008 | P | PASS |
Forrest France
|
|
|
Fire alarm permit work passed inspection after on site repairs were completed including relocated in-ducts at the 6th floor and adjusted appliances on the 4th floor, as-built plans accepted, items on previous correction notice verified for compliance, inspection passed, permit finaled.
|
INSP-Alarm Testing | 9/26/2008 | 9/26/2008 | 9/26/2008 | P | FAIL |
Troy Cobbley
|
|
|
This inspection was for the 4th and 5th floors. Repair the inoperative fire smoke damper on the 4th floor. Provide as-builts as discussed.
|
INSP-Final Inspection | 9/24/2008 | 9/25/2008 | 9/25/2008 | A | FAIL |
Forrest France
|
|
|
Field inspection for the 5th floor only completed today, noted several items in need of revision or adjustment. See 13 item correction notice left on site for a detailed list.
|
INSP-Alarm Testing | 9/18/2008 | 9/19/2008 | 9/19/2008 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given for the sixth floor with sam rogers permission until the vesda interconnections have been tested and the induct detectors have been correctly oriented as per sams and chris's telephone conversation.
|
INSP-Alarm Testing | 9/17/2008 | 9/18/2008 | 9/18/2008 | A | DONE |
Troy Cobbley
|
|
|
Todays inspection was just for the sixth floor. Horn/strobe placement and candella apppears to match the plans. One strobe as marked on the plans needs to be relocated 2' to the south to be within 15'-0" of the end of the corridor. We did not activate the audio/visuals. All of the heat pumps shut down when tested. The induct detectors are mounted half in and half out of the return duct openings. Per the installation guide they are to be placed a minumum six duct widths from the openings. Simplex stated that their engineers said it was ok to be installed that way. I verified with Stephanie that no such verification had been provided with this submittal. Simplex stated that they would provide this information as soon as possible. I told them to provide it to the plan reviewer. Todays testing was completed on that note.
|