INSP-Final Inspection | 9/30/2009 | 10/1/2009 | 10/1/2009 | A | PASS |
Forrest France
|
|
|
Final inspection passed per T. Frost.
|
INSP-Final Inspection | 9/16/2009 | 9/17/2009 | 9/17/2009 | A | FAIL |
Forrest France
|
|
|
Two heads at the second level master bath are obstructed by light fixtures, missing escutcheon at a closet main level, SW head at the stairway is painted, pendent head at the washer/dryer room is too close to an HVAC vent, head at the main level vestibule is blocked by a light fixture.
|
INSP-Final Inspection | 9/1/2009 | 9/2/2009 | 9/8/2009 | A | NR |
Forrest France
|
|
|
Final - Contact: Dave Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley
|
INSP-Sprinkler Rough-in/Hydro | 7/1/2009 | 7/1/2009 | 7/1/2009 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping can be covered. See the city approved plans for location with my signature and todays date. Plans are dated 5/21/2009.
|
INSP-Sprinkler Rough-in/Hydro | 6/22/2009 | 6/24/2009 | 6/24/2009 | A | NR |
Forrest France
|
|
|
rough In - Contact: jeff Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley
|